您当前的位置:
首页 >
文章列表页 >
Comprehensive evaluation of coal-blending scheme in power plants based on PCA and improved TOPSIS method
更新时间:2025-09-28
    • Comprehensive evaluation of coal-blending scheme in power plants based on PCA and improved TOPSIS method

    • Thermal Power Generation   Vol. 48, Issue 11, Pages: 73-78(2019)
    • DOI:10.19666/j.rlfd.201901065    

      CLC: TK16
    • Published Online:29 October 2019,

      Published:2019

    移动端阅览

  • ZHANG Hou, LIU Changliang, WANG Ziqi. Comprehensive evaluation of coal-blending scheme in power plants based on PCA and improved TOPSIS method[J]. Thermal power generation, 2019, 48(11): 73-78. DOI: 10.19666/j.rlfd.201901065.

  •  
  •  

0

Views

196

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on peaking capacity and economy of bypass heat storage scheme for double reheat units
Experimental study on economical efficiency of high proportion lignite blended combustion in a large scale CFB boiler
Application of TOPSIS method in comprehensive evaluation of coal-blending scheme in power plants
Efficiency diagnosis on an oxy-fuel combustion technology based gas-fired boiler
Comprehensive performance analysis of solar hybrid coal-fired power generation

Related Author

SHEN Renhu
ZHENG Puyan
CHENG Jiahao
ZHANG Xiangpeng
HUANG Yatong
YIE Zijie
CAI Bin
ZHAO Zhiyong

Related Institution

上海电力大学能源与机械工程学院
Inner Mongolia Electric Power Research Institute
Guangzhou Special Pressure Equipment Testing and Research Institute
School of Energy and Power Engineering, Changsha University of Science and Technology
School of Energy Science and Engineering, Central South University
0