Thermodynamic analysis of LP cylinder cooling steam of a supercritical 350 MW unit
In view of the design problem of cooling steam in low pressure(LP) cylinder cutting technology of supercritical 350 MW units
by using the thermodynamic design calculation method of steam turbine
the temperature distribution at outlet of each stage blades of the low pressure cylinder under different cooling conditions and normal operation conditions was calculated in detail
and the relationship between the outlet temperature of low pressure cylinder with the cooling steam volume and steam temperature was obtained. The results show that
the final stage blade is in the state of blowing
and the exhaust temperature of the low pressure cylinder is linear with the cooling steam flow rate and the cooling steam temperature. It is negatively related to the cooling steam flow rate and positively correlated with the cooling steam temperature. Therefore
the outlet temperature of the last two stage blades can be effectively controlled by setting the cooling steam flow rate and temperature reasonably. This paper provides theoretical basis for design of the cooling steam of low pressure cylinder when the low pressure cylinderis is resected of the unit
and also provides the corresponding safety theoretical support for cylinder cutting.
Review of the development and application of double-reheat power generation technology
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT