Research on design margin of steam generator in CPR1000 units
更新时间:2025-09-28
    • Research on design margin of steam generator in CPR1000 units

    • Thermal Power Generation   Vol. 48, Issue 3, Pages: 126-131(2019)
    • DOI:10.19666/j.rlfd.201807150    

      CLC: TK172;TM623.9
    • Published Online:26 February 2019,

      Published:2019

    移动端阅览

  • CHAI Weidong, ZHAO Qingsen. Research on design margin of steam generator in CPR1000 units[J]. Thermal power generation, 2019, 48(3): 126-131. DOI: 10.19666/j.rlfd.201807150.

  •  
  •  

0

Views

89

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

PROBLEM AND SOLUTION OF CONDENSED WATER REATING SYSTEM IN A NUCLEAR POWER STATION
ANALYSIS OF CHEMICAL MECHANISM FOR FOULING IN WET FGD SYSTEM AND ITS CONTROL IN OPERATION
STUDY ON CLEANING TECHNOLOGY FOR FOULING SUBSTANCES ON GAS-GAS HEATER IN WET DESULPHURIZATION SYSTEM
METHOD FOR REDUCING SLUDGE DEPOSITION IN STEAM GENERATION OF NUCLEAR POWER PLANT
STUDY ON THE INTERCRYSTALLINE CORROSION RESISTANT ABILITY OF Incoloy800H HEAT TRANSFER TUBES

Related Author

ZHU Xing- bao The SUE Department of CNPEC
ZHOU Peng
WANG Bo
WEN Gong-qian
LIU Shaoyin Hubei Provincial Electric Power Testing & Research Institute
SUN Zhichun1
YANG Yongping1
LONG Guojun2

Related Institution

CGN Engineering Co., Ltd
Hubei Electric Power Test and Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
College of Energy, Power and Mechanical Engineering, North China Electric Power University
Suzhou Thermal Power Research Institute
0