Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit
更新时间:2025-09-28
    • Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit

    • Thermal Power Generation   Vol. 47, Issue 5, Pages: 101-105(2018)
    • DOI:10.19666/j.rlfd.201801029    

      CLC: TK262
    • Published Online:03 May 2018,

      Published:2018

    移动端阅览

  • XUE Zhaonan, YANG Rongzu, WANG Ting, et al. Application of turbine HP-LP bypass system combining with heating in supercritical 350 MW unit[J]. Thermal power generation, 2018, 47(5): 101-105. DOI: 10.19666/j.rlfd.201801029.

  •  
  •  

0

Views

392

下载量

22

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
AN APPROACH TO FEASIBILITY AND ECONOMIC BEHAVIOR OF ADOPTING DIRECT DRY TYPE COOLING SYSTEM FOR SUPERCRITICAL UNITS
TRIAL OPERATION OF BOILER STARTINGUP FOR 600 MW SUPERCRITICAL UNIT IN QINBEI POWER PLANT
SEVERAL PROBLEMS NEEDING TO PAY ATTENTION FOR CHEMICAL SUPERVISION IN CAPITAL CONSTRUCTION COMMISSIONING OF SUPERCRITICAL 600MW UNIT

Related Author

SONG Haifeng
WANG Junfeng
AN Zhonghong
LAN Wenxiang
CHANG Jian
GUO Jinliang
LANG Liping
KE Xiwei

Related Institution

Jinneng Holdings Group Yanggao Thermal Power Co., Ltd
Department of Energy and Power Engineering, Tsinghua University
harbin boiler company limited
Huairou Laboratory Shanxi Research Institute
North China Electric Power Research Institute Co., Ltd
0