WEI Shaoqing, HAO Jiangping, HU Hemin, et al. Thermal energy cascade utilization technology of coordinated waste heat and regenerative systems[J]. Thermal power generation, 2018, 47(6): 111-115.
DOI:
WEI Shaoqing, HAO Jiangping, HU Hemin, et al. Thermal energy cascade utilization technology of coordinated waste heat and regenerative systems[J]. Thermal power generation, 2018, 47(6): 111-115. DOI: 10.19666/j.rlfd.201709106.
Thermal energy cascade utilization technology of coordinated waste heat and regenerative systems
In view of the deficiencies of currently used waste heat utilization technologies
a new thermal energy cascade utilization system for coordinated waste heat and regenerative systems is developed. The system organically combines the regenerative cycle and the waste heat utilization from the boiler and turbine
which has intelligent allocation ability of heat flux direction
better parameter regulation performance and working condition adaptability. This system can optimize dynamically the thermal energy cascade utilization and improve the air preheater performance. Taking an air-cooled 660 MW unit as an example
adopting the traditional low-temperature economizer to recover the waste heat from flue gas can reduce the standard coal consumption rate of the power supply by 1.70 g/(k W·h) at the rated power condition and heat consumption rate by 1.08 g/(k W·h) at the acceptance conditions. After reconstruction of the coordinated waste heat and regenerative systems
the standard coal consumption reductions and heat consumption rate reduced by 3.19 g/(k W·h) and 3.74 g/(k W·h)
respectively. It save 150% energy more than that by the traditional scheme. The thermal economy can be greatly improved.
Energy conservation analysis for waste heat utilization system applying air preheater and using primary air to heat condensate water
Numerical simulation on thermodynamic characteristics of air preheater bypass flue gas waste heat utilization system
Study on energy-saving effect of bypass waste heat utilization system of air preheater in a 1 000 MW unit boiler
Study on coal saving benefit calculation matching system of the turbine-boiler coupled heat utilization system
ANALYSIS OF PLATE-TURNOVER PHENOMENON CONCERNING RUDUCTION GEARBOX OF 29-VI(T) 1780 TYPE AIR PREHEATER SURPASSING THE CLUTCH COUPLING AND TECHNICAL RETROFITTING OF THE STARTING-UP CIRCUIT
Related Author
WANG Jianhang
YAN Weiping
HE Dong
XIE Tian
FAN Qingwei
FANG Jin
HUANG Jiasi
WANG Chunchang
Related Institution
College of Energy, Power and Mechanical Engineering, North China Electric Power University
Xi'an Xire Energy saving Technology Co., Ltd
China Energy Engineering Group Northwest Electric Power Test and Research Institute Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group