WU Shougui, LIU Jifeng, ZHANG Chen, et al. Analysis on start-up and commissioning of supercritical 660 MW steam turbine[J]. Thermal power generation, 2018, 47(4): 99-103.
DOI:
WU Shougui, LIU Jifeng, ZHANG Chen, et al. Analysis on start-up and commissioning of supercritical 660 MW steam turbine[J]. Thermal power generation, 2018, 47(4): 99-103. DOI: 10.19666/j.rlfd.201709104.
Analysis on start-up and commissioning of supercritical 660 MW steam turbine
During the start-up and commissioning process of a supercritical 660 MW unit steam turbine
the lowspeed warm-up time was over long
the load and reheat steam pressure in the initial load process fluctuated abnormally
and multiple protection actions of the reheater caused several serious accidents like tripping.Investigation on these problems shows that
low start-up parameter
high setting value of X7 criterion
dismatch of the high and medium pressure regulating valve opening ratio
and imperfection of the control logic in distributed control system(DCS) and turbine digital electro-hydraulic control system(DEH) were main reasons for the above problems.Through parameter adjustment
X7 standard optimization
control strategy optimization and logic depth investigation
effective preventive measures for the problems were put forward.After start again
the turbine empty load test
loading test and one-time through 168 hours full load continuous trial operation were all successfully completed.The research can provide experience and reference for start-up and commissioning of the same type of steam turbine in newly built power plants.
IMPROVEMENT OF PROTECTION CONTROL SYSTEM FOR STEAM TURBINE OF LARGE-CAPACITY THERMAL POWER UNITS
DESIGN OF CONTROL LOGIC FOR PUTTING TWO STEAM-DRIVEN FEED-WATER PUMPS OF SUPERCRITICAL 660 MW UNIT INTO PARALLEL OPERATION OR STOPPING ONE FROM SERVICE
Automatic control logic optimization for feed-water in start-up period of a 600MW unit
Review of flow path retrofit of 600MW class supercritical steam turbines
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Related Author
ZHOU Li1
YANG Peicheng2
CUI Meng1
YANG Yafei11.Henan Electric Power Research Institute
LI Tiecang1
QIN Zhiguo2
BAI Jingping2 1.Department of Power Engineering
XI Chengchao
Related Institution
Henan Electric Power Test and Research Institute
Henan Electric Power Construction and Debugging Institute
Department of Power Engineering, Shanxi Electric Power Vocational College