Analysis on start-up and commissioning of supercritical 660 MW steam turbine
更新时间:2025-09-28
    • Analysis on start-up and commissioning of supercritical 660 MW steam turbine

    • Thermal Power Generation   Vol. 47, Issue 4, Pages: 99-103(2018)
    • DOI:10.19666/j.rlfd.201709104    

      CLC: TK26
    • Published Online:09 April 2018,

      Published:2018

    移动端阅览

  • WU Shougui, LIU Jifeng, ZHANG Chen, et al. Analysis on start-up and commissioning of supercritical 660 MW steam turbine[J]. Thermal power generation, 2018, 47(4): 99-103. DOI: 10.19666/j.rlfd.201709104.

  •  
  •  

0

Views

111

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

IMPROVEMENT OF PROTECTION CONTROL SYSTEM FOR STEAM TURBINE OF LARGE-CAPACITY THERMAL POWER UNITS
DESIGN OF CONTROL LOGIC FOR PUTTING TWO STEAM-DRIVEN FEED-WATER PUMPS OF SUPERCRITICAL 660 MW UNIT INTO PARALLEL OPERATION OR STOPPING ONE FROM SERVICE
Automatic control logic optimization for feed-water in start-up period of a 600MW unit
Review of flow path retrofit of 600MW class supercritical steam turbines
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units

Related Author

ZHOU Li1
YANG Peicheng2
CUI Meng1
YANG Yafei11.Henan Electric Power Research Institute
LI Tiecang1
QIN Zhiguo2
BAI Jingping2 1.Department of Power Engineering
XI Chengchao

Related Institution

Henan Electric Power Test and Research Institute
Henan Electric Power Construction and Debugging Institute
Department of Power Engineering, Shanxi Electric Power Vocational College
Datong Power Generation Co., Ltd
Huaneng Shanghai Shidongkou Second Power Plant
0