ZHANG Dong-wen1, KE Hao1, LI Zhong-wei1, et al. AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS[J]. Thermal power generation, 2009, 38(3): 91-93.
DOI:
ZHANG Dong-wen1, KE Hao1, LI Zhong-wei1, et al. AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS[J]. Thermal power generation, 2009, 38(3): 91-93. DOI: 10.19666/j.rlfd.2009.03.023.
AN APPROACH TO SAFETY INSPECTION BEFORE ISTALLATION OF BOILERS IN THERMAL POWER PLANTS
The inspection range before installation of boilers
including steam drum
header
main pipelines of feed-water
piping system of the heating surface
and load-bearing structures etc.
has been presented.The focal points of inspection for steam drums and headers have to concentrated to angle welding seams on tubes' sockets;for the piping system of heating surfaces
attention has to be paid to non-circularity and wall-thickness of the tube bends;the defects existing on main pipelines of feed-water can be discovered through macroscopic inspection
and the problem of exceeding set standard for wall-thickness can be discovered through wall-thickness measurement;for load-bearing structures
attention has to be paid to prevention of blowhole defects occurred during the time of welding.The sequence and focal points etc.of inspection have been summarized up.