ANALYSIS ABOUT JOINTING POINT OF RETURNED COOLING WATER FROM THE SLAG COOLER AND IMPROVEMENT SCHEME THEREOF
更新时间:2025-09-28
    • ANALYSIS ABOUT JOINTING POINT OF RETURNED COOLING WATER FROM THE SLAG COOLER AND IMPROVEMENT SCHEME THEREOF

    • Thermal Power Generation   Vol. 38, Issue 3, Pages: 75-77(2009)
    • DOI:10.19666/j.rlfd.2009.03.018    

      CLC: TK264.1
    • Published:2009

    移动端阅览

  • HUANG Jia-si1, ZHANG Ai-jun2, WEI Tong-sheng1, et al. ANALYSIS ABOUT JOINTING POINT OF RETURNED COOLING WATER FROM THE SLAG COOLER AND IMPROVEMENT SCHEME THEREOF[J]. Thermal power generation, 2009, 38(3): 75-77. DOI: 10.19666/j.rlfd.2009.03.018.

  •  
  •  

0

Views

124

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COLLABORATIVE CONTROL AND OPTIMIZATION OF 300MW AIR-COOLED CIRCULATING FLUIDIZED BED UNIT
PROBLEMS OCCURRED IN OPERATION OF OXIDIZING AIR FAN IN DESULPHURIZATION SYSTEM OF 300MW UNIT IN SHOUYANGSHAN POWER PLANT AND SOLVING MEASURES THEREOF
PRIMARY FREQUENCY REGULATION PERFORMANCE TEST OF A 300MW FOSSIL-FIRED GENERATING UNIT
COMPARISON AND ANALYSIS OF THERMODYNAMIC PERFORMANCE BEFORE AND AFTER RETROFITTING A 300MW UNIT AT JIANBI POWER PLANT
APPLICATION XDPS400 DISTRIBUTED CONTROL SYSTEM ON NEWLY BUILT 300MW UNITS

Related Author

ZHAO Zhi-dan1
HAO De-feng1
HUANG Xiao-hua2
DANG Li-jun1
CHEN Zhi-gang1
WANG Ya-jun31.Xi'an Thermal Power Research Institute Co Ltd
WANG Peiping1
ZONG Zhiwei2

Related Institution

China Electric Power Press
Shaanxi Huadian Pucheng Power Generation Co., Ltd
School of Chemical Engineering and Energy, Zhengzhou University
Datang Luoyang Shouyangshan Power Plant
Jianbi Power Plant