您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF SLAGGING IN BOILERS FOR 1000 MW ULTRA-SUPERCRITICAL UNITS AND COUNTERMEASURES THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF SLAGGING IN BOILERS FOR 1000 MW ULTRA-SUPERCRITICAL UNITS AND COUNTERMEASURES THEREOF

    • Thermal Power Generation   Vol. 38, Issue 3, Pages: 66-68(2009)
    • DOI:10.19666/j.rlfd.2009.03.015    

      CLC: TK227.2
    • Published:2009

    移动端阅览

  • HU Zhi-hong1, HAO Wei-dong1, LIU En-sheng2, et al. CAUSE ANALYSIS OF SLAGGING IN BOILERS FOR 1000 MW ULTRA-SUPERCRITICAL UNITS AND COUNTERMEASURES THEREOF[J]. Thermal power generation, 2009, 38(3): 66-68. DOI: 10.19666/j.rlfd.2009.03.015.

  •  
  •  

0

Views

241

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
CAUSE ANALYSIS AND COUNTERMEASURES FOR BURST-CRACKING OF PLATEN SUPERHEATER OF BOILER NO.1
NON-DESTUCTIVE INSPECTION OF AUTOMATIC WELDING DEFECTS FOR BOILER PIPES WITH SMALL DIAMETER AND LARGE WALL-THICKNESS IN ULTRA-SUPERCRITICAL UNITS
TEST STUDY ON POLLUTION BEHAVIOR OF HEATING SURFACE IN BOILERS BURNING SHENHUA COAL
CAUSES LEADING TO ASH CLOGGING IN AIR PREHEATER AND DISPOSAL MEASURES THEREOF

Related Author

LIANG Gui-long
LI Hu
ZHANG Min-qi
XUE Jia-lin
GAO Shang-de
SHAO Tian-you1
CAI Hui2
HOU Zhao-tang21.Huaneng Yuhuan Power Plant

Related Institution

Huaneng Dezhou Power Plant
Huaneng Yuhuan Power Plant
Hancheng Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
North China Electric Power University
0