您当前的位置:
首页 >
文章列表页 >
SIMULATION AND ANALYSIS ABOUT WORN-OUT ON CONNECTING PIPE OF LOW-PRESSURE REHEATER FOR A BOILER OF 600 MW UNIT
更新时间:2025-09-28
    • SIMULATION AND ANALYSIS ABOUT WORN-OUT ON CONNECTING PIPE OF LOW-PRESSURE REHEATER FOR A BOILER OF 600 MW UNIT

    • Thermal Power Generation   Vol. 38, Issue 2, Pages: 54-58(2009)
    • DOI:10.19666/j.rlfd.2009.02.015    

      CLC: TK223.3
    • Published:2009

    移动端阅览

  • LI Xiang-peng1, GAO Zeng-liang1, CHEN Jiang1, et al. SIMULATION AND ANALYSIS ABOUT WORN-OUT ON CONNECTING PIPE OF LOW-PRESSURE REHEATER FOR A BOILER OF 600 MW UNIT[J]. Thermal power generation, 2009, 38(2): 54-58. DOI: 10.19666/j.rlfd.2009.02.015.

  •  
  •  

0

Views

80

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
CAUSE ANALYSIS OF FREQUENT BURST-LEAKAGE OCCURRED ON REHEATER AND WATER-WALL OF 300 MW UTILITY BOILER
CAUSE ANALYSIS OF TUBE-BURST IN LOW-TEMPERATURE REHEATER

Related Author

LIU Tong
XU Gang
AN Xue-zhong
XIE Wen-jun
YIE Feng
DU Bao-hua
LI Yao-jun
LIU Zhen-yu

Related Institution

North China Electric Power University
North China Electric Power University Beijing
Yangxi Seaside Power Development Co., Ltd
Shanxi Shentou Second Power Plant
0