您当前的位置:
首页 >
文章列表页 >
FEASIBILITY ANALYSIS OF ABOLISHING THE STEAM AIR-HEATER OR HOT AIR CIRCULATING FACITITY FOR COAL-FIRED BOILERS IN POWER PLANTS
更新时间:2025-09-28
    • FEASIBILITY ANALYSIS OF ABOLISHING THE STEAM AIR-HEATER OR HOT AIR CIRCULATING FACITITY FOR COAL-FIRED BOILERS IN POWER PLANTS

    • Thermal Power Generation   Vol. 38, Issue 2, Pages: 51-53(2009)
    • DOI:10.19666/j.rlfd.2009.02.014    

      CLC: TM621.2
    • Published:2009

    移动端阅览

  • WANG Chun-chang1, LIU Jian-duan2, LIU Bin21.Xi'an Thermal Powre Research Institute Co Ltd. FEASIBILITY ANALYSIS OF ABOLISHING THE STEAM AIR-HEATER OR HOT AIR CIRCULATING FACITITY FOR COAL-FIRED BOILERS IN POWER PLANTS[J]. Thermal power generation, 2009, 38(2): 51-53. DOI: 10.19666/j.rlfd.2009.02.014.

  •  
  •  

0

Views

135

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

INFLUENCE OF SCR DENITRIFICATION FACILITY UPON THE BOILER STRUCTURE
ANALYSIS OF EFFECTIVENESS AND ECONOMIC EFFICIENCY FOR ON-LINE WATER FLUSHING OF AIR PREHEATER
CAUSE ANALYSIS OF HIGH EXHAUST GAS TEMPERATURE FROM HG-450/13.7-YM24 BOILER AND RETROFIT THEREOF
RETROFIT OF ROTARY AIR PREHEATER FOR ELIMINATING AIR-LEAKAGE
STARTING-UP MODES FOR DRIVING DE VICE OF AIR PREHEATERS

Related Author

KUANG Guo-qiang
XU Dang-qi
YING Ming-liang
YU Ji-an
XIE Jian-yong
DAI Cheng-feng
HU Jie 1.Zhejiang Provincial Electric Power Testing&Research Institute
ZHOU Bao-shan

Related Institution

Huadian Changsha Sofa Electric Co., Ltd
Zhejiang Electric Power Test and Research Institute
Guodian Beilun First Power Generation Co., Ltd
Beilun Power Generation Co., Ltd
Guodian Suqian Thermal Power Co., Ltd
0