CONDITION OF PUTTING THE STEAM AIR-HEATER INTO SERVICE FOR COAL-FIRED BOILERS IN POWER PLANTS
更新时间:2025-09-28
    • CONDITION OF PUTTING THE STEAM AIR-HEATER INTO SERVICE FOR COAL-FIRED BOILERS IN POWER PLANTS

    • Thermal Power Generation   Vol. 38, Issue 2, Pages: 48-50(2009)
    • DOI:10.19666/j.rlfd.2009.02.013    

      CLC: TK223.34
    • Published:2009

    移动端阅览

  • CHEN Lu1, LIU He21.North-west Electric Power Construction and Debugging Institute. CONDITION OF PUTTING THE STEAM AIR-HEATER INTO SERVICE FOR COAL-FIRED BOILERS IN POWER PLANTS[J]. Thermal power generation, 2009, 38(2): 48-50. DOI: 10.19666/j.rlfd.2009.02.013.

  •  
  •  

0

Views

154

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Flue gas recirculation scheme for double-reheat boilers
Application of combined system of low pressure economizer and air heater
Calculation method of air preheater leakage rate for boiler mixedly burning pulverized coal and blast furnace gas
INFLUENCE OF RETROFITTING THE AIR AND FLUE GAS DUCTS FOR A 1025t/h BOILER UPON THE SPECIFIC AUXILIARY POWER CONSUMPTION
ANALYSIS AND REMEDY OF COMMON PROBLEMS FOR AIR PREHEATER WITH ROTARY HEATING SURFACE

Related Author

FAN Qingwei
CHAI Qi
MAO Yijun
LIU Nianping
SU Yongning
ZHANG Huadong
ZHANG Zhixiang
JIA Zhaopeng

Related Institution

Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Anyuan Power Generation Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
Huaneng Shandong Power Generation Co.,Ltd.
Xi'an Thermal Power Research Institute Co.,Ltd.
0