    • PROBLEMS EXISTING IN PNEUMATIC ASH CONVERING SYSTEM OF 300 MW CFB BOILER AND RETROFIT SCHEME THEREOF

    • Thermal Power Generation   Vol. 38, Issue 2, Pages: 45-47(2009)
    • DOI:10.19666/j.rlfd.2009.02.012    

      CLC: TK229.6
    • Published:2009

    移动端阅览

  • KUANG Wei1, CHEN Jian-bin1, JIANG Jian-zhong2, et al. PROBLEMS EXISTING IN PNEUMATIC ASH CONVERING SYSTEM OF 300 MW CFB BOILER AND RETROFIT SCHEME THEREOF[J]. Thermal power generation, 2009, 38(2): 45-47. DOI: 10.19666/j.rlfd.2009.02.012.

  •  
  •  

0

Views

97

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation of variable-load characteristics of a supercritical circulating fluidized bed boiler
CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
AN APPROACH TO STEEL MATERIAL BEING USED FOR PRESSURIZED COMPONENTS OF HOME-MADE SUPERCRITICAL BOILERS
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
TEST ASSESSMENT OF INDUCTIVE PIPEBENDING WITH BENDING RADIUS OF 1.5 D AND APPLICATION THEREOF

Related Author

LIU Liang
GAO Kaixuan
XIE Deqing
HE Jianle
HUANG Zhong
JIN Yan
LYU Junfu
KE Xiwei

Related Institution

Huadian Electric Power Research Institute Co., Ltd
Huadian International Power Co., Ltd. Shuozhou Thermal Power Branch
Huairou Laboratory Shanxi Research Institute
Department of Energy and Power Engineering, Tsinghua University
School of Electrical and Power Engineering, Taiyuan University of Technology
0