国电龙山发电厂1号机组为河北省南网投运的首台大型直接空冷机组
重点介绍该机组空冷凝汽器(空凝器)冬季热态清洗过程。经过多次对空凝器热态清洗方案的优化
合理设计临时清洗系统
使整个冬季热态清洗过程仅用了4 d时间。清洗期间
空凝器未发生冻结现象
使1号机组顺利地提前投产运行。
Abstract
The unit No.1 in Guodian Longshan Power Plant is the first large-capacity air-cooled unit having been put into operation in the southern power grid of Hebei Province
the process of hot-state cleaning of air-cooled condenser for said unit in winter season has been emphatically presented.Through optimization of hot-state cleaning scheme for the air-cooled unit in many times and reasonable design of the temporary cleaning system
the entire process of hot-state cleaning in winter season is completed only in four days
freezing phenomenon has not occurred on the air-cooled condenser
making the unit no.1 being successfully put into operation in advance.