MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS
|更新时间:2025-09-28
|
MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS
Thermal Power GenerationVol. 38, Issue 1, Pages: 27-30(2009)
SHI Yan-zhou, ZHU Li-tong, YAO Xiao-lin, et al. MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS[J]. Thermal power generation, 2009, 38(1): 27-30.
DOI:
SHI Yan-zhou, ZHU Li-tong, YAO Xiao-lin, et al. MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS[J]. Thermal power generation, 2009, 38(1): 27-30. DOI: 10.19666/j.rlfd.2009.01.007.
MEASUREMENT AND CALCULATION METHOD FOR THERMAL PERFORMANCE TEST OF ULTRA-SUPERCRITICAL UNIT WITH STEAM TURBINE EQUIPPED WITH DOUBLE-ROW HIGH-PRESSURE HEATERS
摘要
针对带双列高压加热器的超超临界机组特点
分析了双列高压加热器水侧流量不平衡对计算结果的影响。实例计算表明
采用等流量分配的加热器热平衡方法完全满足机组性能考核试验标准。对试验条件和测点布置提出了具体要求。
Abstract
Directing against the features of ultra-supercritical unit equipped with double-row high-pressure(HP)feed-water heaters
the influence of unbalance flow rate in the water side of double-row HP heaters upon the calculated results has been analysed.Results of calculation in concrete examples show that the adoption of thermal balance method in heaters with equal flow rate distribution can fully satisfy the test standard of performance assessment for the units
and the requirements for test conditions and arrangement of measuring points have been put forward.
SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
ANALYSIS OF FAULTS OCCURRED IN SYNCHRONIZATION WITH POWER NETWORK FOR TAKING INITIAL LOAD BY STEAM TURBINE OF A 180MW GAS AND STEAM TURBINE COMBINED CYCLE UNIT
CAUSE ANALYSIS AND IMPROVEMENT MEASURES FOR PRESSURE REDUCTION OF LUBRICANT OIL DURING STARTUP OF 300MW UNITS