您当前的位置:
首页 >
文章列表页 >
OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT
更新时间:2025-09-28
    • OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT

    • Thermal Power Generation   Vol. 38, Issue 1, Pages: 1-3(2009)
    • DOI:10.19666/j.rlfd.2009.01.001    

      CLC: TM761.22
    • Published:2009

    移动端阅览

  • ZHANG Qiu-sheng1, FU Ren-jie21.Beijing Guohua Electric Power Technology Research Centre Co Ltd. OPTIMAL LOAD DISTRIBUTION AMONG UNITS IN THERMAL POWER PLANT[J]. Thermal power generation, 2009, 38(1): 1-3. DOI: 10.19666/j.rlfd.2009.01.001.

  •  
  •  

0

Views

320

下载量

12

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation modelling of power system for supercritical units considering dynamic heat exchange of once-through boiler
PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT

Related Author

XU Darui
HAO Ling
CHEN Lei
QI Xin
LIU Yifeng
LI Jiangpeng
HUANG Yihan
XU Fei

Related Institution

State Grid Ningxia Electric Power Co., Ltd
National Key Laboratory of New Power System Operation and Control, Tsinghua University
Department of Electrical Engineering and Applied Electronic Technology, Tsinghua University
Heze Power Plant
Zhungeer Power Plant Hohhot
0