您当前的位置:
首页 >
文章列表页 >
STUDY ON THE SOUND TRANSMISSION TUBE USED FOR LEAKAGE MONITORING SYSTEM REGARDING FOUR KINDS OF TUBES IN BOILERS
更新时间:2025-09-28
    • STUDY ON THE SOUND TRANSMISSION TUBE USED FOR LEAKAGE MONITORING SYSTEM REGARDING FOUR KINDS OF TUBES IN BOILERS

    • Thermal Power Generation   Vol. 37, Issue 12, Pages: 103-106(2008)
    • DOI:10.19666/j.rlfd.2008.12.027    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • XU Yuan-zhe1, ZHAO Xin1, HU Zhi-hui1, et al. STUDY ON THE SOUND TRANSMISSION TUBE USED FOR LEAKAGE MONITORING SYSTEM REGARDING FOUR KINDS OF TUBES IN BOILERS[J]. Thermal power generation, 2008, 37(12): 103-106. DOI: 10.19666/j.rlfd.2008.12.027.

  •  
  •  

0

Views

137

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF REPAIR WHEN LEAKAGE OCCURRED ON FOUR KINDS OF TUBES IN THE BOILER OF 300MW UNIT
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS

Related Author

LONG Huiguo
LONG Yi
CHEN HongdongHunan Provincial Electric Power Testing & Research Institute
HU Min
RAO Supo
LUO Sheng
ZHANG Yu jie
Wu Ping lin

Related Institution

Hunan Electric Power Test and Research Institute
Shajiao C Power Plant
Guangdong Yuedian Group Co., Ltd.
The Pearl River Power Plant Guangdong
0