您当前的位置:
首页 >
文章列表页 >
PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF
更新时间:2025-09-28
    • PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF

    • Thermal Power Generation   Vol. 37, Issue 12, Pages: 96-98(2008)
    • DOI:10.19666/j.rlfd.2008.12.025    

      CLC: TM621.7
    • Published:2008

    移动端阅览

  • LI Jun1, LI Jian-he1, HUANG Li-li21.Huaibei Guo'an Electric Power Co Ltd. PROBLEMS OCCURRED FROM ADDITIONALLY INSTALLING HIGH-VOLTAGE FREQUENCY CONVERTER ONTO CONDENSATE PUMPS AND SOLVING MEASURES THEREOF[J]. Thermal power generation, 2008, 37(12): 96-98. DOI: 10.19666/j.rlfd.2008.12.025.

  •  
  •  

0

Views

119

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

REALIZATION OF ZERO SPECIFIC CONSUMPTION FOR CONDENSATE PUMPS,CIRCULATING-WATER PUMPS,AND MOTOR-DRIVEN FEED-WATER PUMPS DURING START-UP PROCESS OF 300MW UNITS
FREQUENCY CONVERSION RETROFIT AND ENERGY-SAVING OF CONDENSATE PUMP IN HUAYU POWER PLANT
PRACTICE OF CHANGING FEED-WATER TREATMENT MODE FOR 300 MW UNIT IN HEZE POWER PLANT FROM AVT(R) INTO AVT(O)
CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
ANALYSIS OF TURBINE-BOILER COORDINATED CONTROL AND AGC SYSTEM IN YANGLUO POWER PLANT

Related Author

ZHOU DaGuang'an Power Generation Co Ltd
XIONG Kang-jun Datang Huayu Power Generation Co Ltd
LI Xiu-juan Heze Power Plant
CHANG Shi-ji
WANG Zhen
LI De-shi
CHEN Min
HE Tong-xiang

Related Institution

Guang'an Power Generation Co., Ltd
Datang Huayu Power Generation Co., Ltd
Heze Power Plant
Zhungeer Power Plant Hohhot
Wuhan University
0