您当前的位置:
首页 >
文章列表页 >
RETROFIT OF COORDINATED CONTROL SYSTEM FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600 MW UNIT AND APPLICATION OF AGC STRATEGY
更新时间:2025-09-28
    • RETROFIT OF COORDINATED CONTROL SYSTEM FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600 MW UNIT AND APPLICATION OF AGC STRATEGY

    • Thermal Power Generation   Vol. 37, Issue 12, Pages: 85-89(2008)
    • DOI:10.19666/j.rlfd.2008.12.022    

      CLC: TM621
    • Published:2008

    移动端阅览

  • WANG Jia-xing1, BAI Yan1, DONG Ling1, et al. RETROFIT OF COORDINATED CONTROL SYSTEM FOR ONCE-THROUGH BOILER OF SUPERCRITICAL 600 MW UNIT AND APPLICATION OF AGC STRATEGY[J]. Thermal power generation, 2008, 37(12): 85-89. DOI: 10.19666/j.rlfd.2008.12.022.

  •  
  •  

0

Views

497

下载量

29

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

APPLICATION OF DOUBLE-MODE CONTROL STRATEGY OF SUPERHEATED STEAM TEMPERATURE TO DCS
ANALYSIS AND IMPROVEMENT OF SEALING WATER LEAKAGE PROBLEM FROM SHAFT END OF STEAM-DRIVEN FEED-WATER PUMP OF SUPERCRITICAL 600 MW UNIT
ANALYSIS OF CONTROL-ORIENTED DYNAMIC BEHAVIOR FOR SUPERHEATED STEAM TEMPERATURE
THE CONTROL STRATEGY OF FEED WATER FOR SUPERCRITICAL 600 MW UNIT
STUDY ON AGC CONTROL FUNCTION OPTIMIZATION FOR UNITS NO.1 AND NO.2 IN HUANENG RIZHAO POWER PLANT

Related Author

FENG Jiang-tao Taiyuan Electric Power High Profession College
ZHU Chao-yangZheneng Lanxi Power Generation Co Ltd
WANG Kun1
HU Zheng-ding2
KONG Song-tao11.College of Mechnic and Power Engineering
WANG Jian-wei
YANG Pei-chengHenan Electric Power Construction and Debugging Institute
ZHAO Zhidan1

Related Institution

Department of Information Engineering, Taiyuan Electric Power College
Zhejiang Energy Lanxi Power Generation Co., Ltd
College of Mechanical and Power Engineering, Chongqing University of Science and Technology
Chongqing Sanfeng Kavanta Environmental Industry Co., Ltd
Henan Electric Power Construction and Debugging Institute
0