您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF CORROSION LEAKAGE ON CONDENSER TUBES IN SUIZHONG POWER PLANT AND REMEDY THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF CORROSION LEAKAGE ON CONDENSER TUBES IN SUIZHONG POWER PLANT AND REMEDY THEREOF

    • Thermal Power Generation   Vol. 37, Issue 12, Pages: 57-59(2008)
    • DOI:10.19666/j.rlfd.2008.12.015    

      CLC: TK264.11
    • Published:2008

    移动端阅览

  • WU Chuan-nan1, WANG Ju-chong2, DENG Yu-qiang2, et al. CAUSE ANALYSIS OF CORROSION LEAKAGE ON CONDENSER TUBES IN SUIZHONG POWER PLANT AND REMEDY THEREOF[J]. Thermal power generation, 2008, 37(12): 57-59. DOI: 10.19666/j.rlfd.2008.12.015.

  •  
  •  

0

Views

169

下载量

6

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

DEVELOPMENT AND APPLICATION OF NEW TYPE FILMOGEN FOR COPPER TUBING IN CONDENSERS
AN APPROACH TO ENHANCING FILM FORMATION QUALITY ON COPPER TUBES IN CONDENSER BY USING FERROUS SULFATE ONLY AT ONCE
Typical faults and countermeasures of flue gas cooler for coal-fired boilers
PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
THE INFLUENCE OF STEAM FLOW FIELD AT CONDENSER'S TUBEBUNDLE INLET UPON EXHAUST PRESSURE OF STEAM TURBINE

Related Author

GUO Jun-ke1
LI Xing21.Tianjin Municipal Electric Power Science Research Institute
WANG Chaoyang
WANG Ping Huaneng Yuhuan Power Plant
HU Fangfang
REN Jiyun
DENG Lei
WANG Yikun

Related Institution

Tianjin Electric Power Research Institute
Tianjin Electric Power Company
Huaneng Yuhuan Power Plant
State Key Laboratory of Multiphase Flow for Power Engineering, Xi'an Jiaotong University
China Energy Engineering Group Shaanxi Electric Power Design Institute Co., Ltd
0