PROBLEMS EXISTING IN PNEUMATIC ASH HANDLING SYSTEM OF HANDAN THERMAL POWER PLANT AND RETROFIT THEREOF
摘要
邯郸热电厂气力除灰系统在运行中存在出力不足、堵管、管道磨损、用气量大、落灰不畅等问题
对此
提出了增加仓泵容积、改进气灰混合方式、更换磨损弯头、降低输灰速度及空气系统增容改造等措施
实施后基本解决了上述问题
保证了系统运行的稳定性。
Abstract
The problems existing in operation of pneumatic ash handling system in Handan Thermal Power Plant are as follows:insufficient output capacity
clogging in pipe
worn-out of pipelines
large amout of used air
and inadequate ash-dropping etc..For these
some measures
such as increasing the capacity of depository pump
improving mixing mode of air and ash
replacing the worn-out elbows
decreasing the speed of ash handling
and retrofitting the air system to increase the capacity etc.
have been put forward.After implementation
the above-mentined problems have basically been solved
ensuring the stability in operation of said system.