您当前的位置:
首页 >
文章列表页 >
CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF
更新时间:2025-09-28
    • CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF

    • Thermal Power Generation   Issue 9, Pages: 56-58(2008)
    • DOI:10.19666/j.rlfd.2008.09.016    

      CLC: X701.2
    • Published:2008

    移动端阅览

  • CHEN Zuo-wen Huaneng Shantou Power Plant. CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF[J]. Thermal power generation, 2008, (9): 56-58. DOI: 10.19666/j.rlfd.2008.09.016.

  •  
  •  

0

Views

116

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TROUBLESOME PROBLEMS EXISTING IN ELETROSTATIC PRECIPITATORS AT ZHUJIANG POWER PLANT AND IMPROVEMENT MEASURES THEREOF
AN APPROACH TO PROBLEM OF CORRECTING DUST REMOVAL EFFICIENCY FOR ELETROSTATIC PRECIPITATORS
SIMULATION TEST STUDY AND APPLICATION OF A COMBINED DUST-ELIMINATING MODE BEING COMPOSED OF ELECTRIC PRECIPITATOR AND VENTURI WATER FILM SCRUBBER
MAIN PROBLEMS EXISTING IN THE ONSERVICE ELECTRIC PRECIPITATORS AT COALFIRED POWER PLANTS AND COUNTERMEASURES THEREOF
EXPERIMENTAL STUDY ON SELECTIVE ADSORPTION BY ACTIVATED CARBON FOR SO2 AND NO EN THE FLUE GAS

Related Author

WANG Yun-chi
ZHANG Bin-wei
QI Jun-tian
李广民
李广建
祁君田
唐强
张智刚

Related Institution

The Pearl River Power Plant Guangzhou
Xi'an Thermal Power Research Institute Co., Ltd
Pingdingshan Coal Industry Group Kengkou Power Plant
0