您当前的位置:
首页 >
文章列表页 >
STUDY ON USING HOT AIR FOR HEATING CLEANED FLUE GAS IN GUOHUA TAISHAN POWER PLANT
更新时间:2025-09-28
    • STUDY ON USING HOT AIR FOR HEATING CLEANED FLUE GAS IN GUOHUA TAISHAN POWER PLANT

    • Thermal Power Generation   Issue 9, Pages: 51-52(2008)
    • DOI:10.19666/j.rlfd.2008.09.014    

      CLC: X701.3
    • Published:2008

    移动端阅览

  • LI Zhan-yuan, SUN Yue, YANG Jian-xing, et al. STUDY ON USING HOT AIR FOR HEATING CLEANED FLUE GAS IN GUOHUA TAISHAN POWER PLANT[J]. Thermal power generation, 2008, (9): 51-52. DOI: 10.19666/j.rlfd.2008.09.014.

  •  
  •  

0

Views

256

下载量

17

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF PROLONGED IDLING TIME FOR UNIT NO.2 IN GUOHUA TAISHAN POWER PLANT AND DISPOSAL THEREOF
OPTIMIZED RETROFIT OF WASTEWATER TREATMENT SYSTEM IN WET DESULPHURIZATION OF 600 MW UNIT
WATER CONSUMPTION OF WET FGD DEVICE FOR 600 MW UNITS
Prediction model for flue gas wet desulfurization efficiency based on partial least squares support vector machine
Heat balance of evaporation tower for FGD wastewater treatment

Related Author

LU Lian-xiangGuohua Taishan Power Plant
NIE Pengfei Datang Wangtan Power Generation Co Ltd
NIE Pengfei
WANG Yang
WU Xuemin Heibei Datang International Wangtan Power Generation Co.Ltd.
CUI Shiwen
TIE Zhixin
DING Chengfu

Related Institution

Guohua Taishan Power Plant
Datang Wangtan Power Generation Co., Ltd
Hebei Datang International Wangtan Power Generation Co., Ltd
School of Information Science and Technology, Zhejiang Sci-Tech University
Focused Photonics (Hangzhou) Inc.
0