HUANG Min Guangzhou Power Plant Co Ltd. METAL SUPERVISION AFTER PUTTING HIGH-TEMPERATURE FASTENERS INTO SERVICE IN POWER PLANTS[J]. Thermal power generation, 2008, (9): 12-14.
DOI:
HUANG Min Guangzhou Power Plant Co Ltd. METAL SUPERVISION AFTER PUTTING HIGH-TEMPERATURE FASTENERS INTO SERVICE IN POWER PLANTS[J]. Thermal power generation, 2008, (9): 12-14. DOI: 10.19666/j.rlfd.2008.09.004.
METAL SUPERVISION AFTER PUTTING HIGH-TEMPERATURE FASTENERS INTO SERVICE IN POWER PLANTS
摘要
DL438—2000及DL/T439—2006均对高温紧固件投运后的监督检验作出了规定
分析两者发现
前者的规定使监督检验人员把硬度作为判断螺栓损伤的唯一指标
而后者坚持在螺栓监督过程中采用多项指标进行综合评价
因此更具有科学性和可操作性。对此
建议相关部门尽量统一这两种监督检验方式对螺栓的检验要求。
Abstract
In standards DL 438-2000 and DL/T 439-2006
the supervision and inspection of high-temperature fasteners after putting them into service all had been stipulated.It is discovered from analysis of both standards that the stipulation in DL 438-2000 is easy to make the supervisor or inspector to regard the hardness as only one index for judging the damage of bolts
but in DL/T 439-2006
it is insisted to use several indices in supervisory process of bolts for comprehensive evaluation
therefore
being more scientific and practicable.For this
it is recommented that the related departments have to unify the requirements for inspecting bolts as far as possible in the two above-mentioned supervision and inspection modes.