您当前的位置:
首页 >
文章列表页 >
STUDY ON FEASIBILITY OF DEFECT-ELIMINATING AND CAPACITY-INCREASING RETROFIT FOR LARGE-SCALE TURBO-GENERATOR SET
更新时间:2025-09-28
    • STUDY ON FEASIBILITY OF DEFECT-ELIMINATING AND CAPACITY-INCREASING RETROFIT FOR LARGE-SCALE TURBO-GENERATOR SET

    • Thermal Power Generation   Issue 8, Pages: 65-68(2008)
    • DOI:10.19666/j.rlfd.2008.08.019    

      CLC: TM311
    • Published:2008

    移动端阅览

  • YANG Bo1, BAI Tang-tang2, CHEN Cang1, et al. STUDY ON FEASIBILITY OF DEFECT-ELIMINATING AND CAPACITY-INCREASING RETROFIT FOR LARGE-SCALE TURBO-GENERATOR SET[J]. Thermal power generation, 2008, (8): 65-68. DOI: 10.19666/j.rlfd.2008.08.019.

  •  
  •  

0

Views

48

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STUDY ON ABNORMAL VIBRATION OF GENERATOR'S REAR BEARING FOR HOMEMADE 125MW UNITS
CAUSE ANALYSIS OF OUTLET FLEXIBLE CONNECTOR’S BREAKAGE FOR 9E TYPE GENERATOR
INFLUENCE OF ROTORVOLTAGE WAVEFORM UPON FIELDLOSS PROTECTION OF THE GENERATOR
REMEDIAL THEATMENT FOR HIGH SPEED GROUNDING ACCIDENT OF THE ROTOR WINDING IN GENERATOR NO.5 OF BAOTOU THERMAL POWER PLANT NO.1
EXISTING PROBLEMS IN AIR-COOLING SYSTEM OF GENERATOR NO.1 AND RETROFIT THEREOF

Related Author

HU Jianxin
GAN Meng-bi
CHENG Fang-lin
CHEN Peng
LUO Jun
FANG Zhanzhou
YOU Lixin
YANG Gui-ying

Related Institution

Jiangsu Electric Power Research Institute
Moon Bay Gas Turbine Power Plant
Luoding
Yuelong Power Generation Co., Ltd. Guangdong Lianzhou
0