您当前的位置:
首页 >
文章列表页 >
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
更新时间:2025-09-28
    • ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT

    • Thermal Power Generation   Issue 8, Pages: 37-39(2008)
    • DOI:10.19666/j.rlfd.2008.08.010    

      CLC: TK223.25
    • Published:2008

    移动端阅览

  • WANG Xin-ge, LI Hong-tao, LIANG Mao-chun Huadian Zouxian Power Plant. ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT[J]. Thermal power generation, 2008, (8): 37-39. DOI: 10.19666/j.rlfd.2008.08.010.

  •  
  •  

0

Views

112

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TESTING OF COAL PULVERIZING SYSTEM AS WELL AS ENERGY-SAVING AND CONSUMPTION-REDUCING THEREOF
STUDY ON CONSTRUCTION OF HEAT RELEASE SIGNAL FOR ULTRA-SUPERCRITICAL UNITS
SCALING ON THROTTLE PLATE OF THE WATER-WALL IN BOILER FOR ULTRA-SUPERCRITICAL UNIT AND DISPOSAL THEREOF
STUDY ON LIFE MANAGEMENT TECHNOLOGY FOR BOILERS OF ULTRA-SUPERCRITICAL 1000MW UNTIS
STEAM TEMPERATURE CONTROL STRATEGY FOR PIPE-BLOWING BY USING STEAM UNDER CONDITION WITHOUT BOILER WATER CIRCULATING PUMP FOR ULTRA-SUPERCRITICAL 1 000 MW UNIT

Related Author

王红雨
刘超
朱志涛
刘骁平
尚勇
SUN Qun-li
LI Jia-chuan
WANG Zhao

Related Institution

Guodian Thermal Power Research Institute
Qingshan Thermal Power Plant
College of Energy and Power Engineering, North China Electric Power University
Huaneng Yuhuan Power Plant
0