您当前的位置:
首页 >
文章列表页 >
OPTIMAL TEMPERATURE RISE RATE IN THE COLD START-UP PROCESS OF STEAM TURBINES
更新时间:2025-09-28
    • OPTIMAL TEMPERATURE RISE RATE IN THE COLD START-UP PROCESS OF STEAM TURBINES

    • Thermal Power Generation   Issue 7, Pages: 57-61(2008)
    • DOI:10.19666/j.rlfd.2008.07.015    

      CLC: TK267
    • Published:2008

    移动端阅览

  • LI Ming, YANG Ji-ming, BAI YunChangsha University of Science &Technology. OPTIMAL TEMPERATURE RISE RATE IN THE COLD START-UP PROCESS OF STEAM TURBINES[J]. Thermal power generation, 2008, (7): 57-61. DOI: 10.19666/j.rlfd.2008.07.015.

  •  
  •  

0

Views

134

下载量

5

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

SIMPLIFIED FINITEELEMENT CALCULATION MODEL OF TEMPERATURE FIELD FOR STEAM TURBINE ROTOR
APPLICATION OF SOLID SELF-LUBRICATING TECHNOLOGY IN POWER PLANTS
STUDY ON CONTROL SYSTEM SETTING OF DOUBLE EXTRACTION ADJUSTABLE STEAM TURBINE
STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS

Related Author

LUO Juan
HU Niansu
QI Haitao
WANG Zhijun
WANG Chenyu
SU Tongchun
LIU Hong
ZHANG Yu jie

Related Institution

Wuhan University
Zhangze Power Plant
Zhangze Power Plant Shanxi Changzhi
Harbin Power Station Engineering Co., Ltd
0