您当前的位置:
首页 >
文章列表页 >
PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS
更新时间:2025-09-28
    • PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS

    • Thermal Power Generation   Issue 7, Pages: 26-29(2008)
    • DOI:10.19666/j.rlfd.2008.07.006    

      CLC: TK229.66
    • Published:2008

    移动端阅览

  • YAN Zheng1, XU Hua-nian2, TIAN De-jun3, et al. PREVENTIVE MEASURES FOR RE-BURNING IN TAIL END FLUE DUCT OF CFB BOILERS[J]. Thermal power generation, 2008, (7): 26-29. DOI: 10.19666/j.rlfd.2008.07.006.

  •  
  •  

0

Views

92

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Simulation of variable-load characteristics of a supercritical circulating fluidized bed boiler
CLOSED-LOOP CONTROL SYSTEM OF CFB BOILERS
DETERMINATION OF FUEL LAYER THICKNESS IN CFB BOILERS
CAUSE ANALYSIS CONCERNING "TURNING-OVER" OF THE BED-MATERIAL IN 300 MW CFB BOILER AND COUNTERMEASURES IN ITS OPERATION
CHARACTERISTIC ANALYSIS OF TUBE-BURST OCCURRED ON HEATING SURFACE OF THE WATER-WALL IN 300 MW CFB BOILER

Related Author

LIU Liang
GAO Kaixuan
XIE Deqing
HE Jianle
HUANG Zhong
JIN Yan
LYU Junfu
KE Xiwei

Related Institution

Huadian Electric Power Research Institute Co., Ltd
Huadian International Power Co., Ltd. Shuozhou Thermal Power Branch
Huairou Laboratory Shanxi Research Institute
Department of Energy and Power Engineering, Tsinghua University
School of Electrical and Power Engineering, Taiyuan University of Technology
0