您当前的位置:
首页 >
文章列表页 >
MEASURES FOR PREVENTING OVER-TEMPERATURE ON HEATING SURFACE OF W-SHAPEDFIRE BOILER EQUIPED FOR 600 MW UNIT
更新时间:2025-09-28
    • MEASURES FOR PREVENTING OVER-TEMPERATURE ON HEATING SURFACE OF W-SHAPEDFIRE BOILER EQUIPED FOR 600 MW UNIT

    • Thermal Power Generation   Issue 4, Pages: 43-46(2008)
    • DOI:10.19666/j.rlfd.2008.04.011    

      CLC: TK227
    • Published:2008

    移动端阅览

  • DANG Xiao-jian1, GUO Jun-wen1, ZHOU Gang21. Xi'an Thermal Power Research Institute Co Ltd. MEASURES FOR PREVENTING OVER-TEMPERATURE ON HEATING SURFACE OF W-SHAPEDFIRE BOILER EQUIPED FOR 600 MW UNIT[J]. Thermal power generation, 2008, (4): 43-46. DOI: 10.19666/j.rlfd.2008.04.011.

  •  
  •  

0

Views

167

下载量

9

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1
CAUSE ANALYSIS AND TEST STUDY ON SOMEHAT LOWER STEAM TEMPERATURE FOR A 2008t/h CORNER TANGENTIAL FIRING BOILER
Experimental study on co-firing of anthracite and bituminous coal in a W-flame boiler
Retrofitting of burning bituminous coal for a 300MW unit boiler and the anti-coking countermeasures
Research on main and reheat steam temperature lifting method for ultra supercritical 1 000 MW unit double-tangential circular boiler

Related Author

赵勇钢
蔡斌
刘继东
于忠义
安锦民
郑晓康
张传名
宋国良

Related Institution

Inner Mongolia Electric Power Research Institute
Baotou First Thermal Power Plant
Zhejiang Energy Group
Shante Wanfeng Thermal Power Co., Ltd
0