THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT
更新时间:2025-09-28
    • THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT

    • Thermal Power Generation   Issue 4, Pages: 37-39(2008)
    • DOI:10.19666/j.rlfd.2008.04.009    

      CLC: TK223
    • Published:2008

    移动端阅览

  • ZHANG Chun-lin1, XUE Ning21. Guohua Taicang Power Plant. THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT[J]. Thermal power generation, 2008, (4): 37-39. DOI: 10.19666/j.rlfd.2008.04.009.

  •  
  •  

0

Views

190

下载量

7

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

COMPARISON OF PRESSURE-STABILIZING METHOD AND PRESSURE-REDUCING METHOD FOR STEAM BLOWING BOILER OF SUPERCRITICAL UNITS
TEST STUDY ON COMBUSTION ADJUSTMENT OF BOILER FOR SUPERCRITICAL 600MW UNIT IN YANGZHOU POWER PLANT
TEST STUDY ON INFLUENCE OF THE REVERSED TANGENTIAL ANGLE FOR SEPARATING OVER-FIRED AIR UPON THE AERODYNAMIC FIELD IN FURNACE
INFLUENCE OF OXYGEN TREATMENT FOR SUPERCRITICAL UNITS UPON FORMATION AND PEEL-OFF OF OXIDE SKIN
Staging combustion retrofitting for a 300MW unit coal-fired boiler

Related Author

WANG Hong-yu1
CHEN Xin-yu2
CHEN Hua-chun3
LIU Chao1
WU Xian-rong1
CHANG Lei1 1.Xi'an Thermal Power Research Institute Co Ltd
JIANG Jian-gang1
LI Yong-ling1

Related Institution

Huaneng Taicang Power Generation Co., Ltd
Jiangsu Electric Power Construction Third Engineering Company
Power Department of Baoding Electric Power Vocational and Technical College
Department of Power Engineering, North China Electric Power University
School of Energy and Power Engineering, Xi'an Jiaotong University
0