WANG Cheng-liang Laicheng Power Plant. CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF[J]. Thermal power generation, 2008, (3): 83-84.
DOI:
WANG Cheng-liang Laicheng Power Plant. CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF[J]. Thermal power generation, 2008, (3): 83-84. DOI: 10.19666/j.rlfd.2008.03.023.
CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF
摘要
2006年11月
莱城发电厂4×300MW机组循环水泵自高速切换低速运行后
经对比发现1号机组凝汽器真空偏低约1.5kPa
凝汽器循环水进水温度高4℃~5℃
导致机组煤耗率增加约3.1g/(kW·h)
经济性显著降低。经过原因分析及处理
消除了真空下降后
提高了1号机组运行的经济性。
Abstract
After switching over the circulating-water pump of 4×300 MW units in Laicheng Power Plant from high speed to low speed operation in November
2006
it had been discovered from comparison that the condenser's vacuum of unit no.1 was somewhat lower than about 1.5 kPa
the inlet water temperature of the circulating-water pump was 4℃~5℃ higher
leading to the coal consumption ratio of said unit being increased by about 3.18 g/(kW·h)
the economic efficiency being obviously lowered. Through cause analysis and remedy
the economic efficiency in operation of unit no.1 has been improved after eliminating the vacuum drop.
REALIZATION OF ZERO SPECIFIC CONSUMPTION FOR CONDENSATE PUMPS,CIRCULATING-WATER PUMPS,AND MOTOR-DRIVEN FEED-WATER PUMPS DURING START-UP PROCESS OF 300MW UNITS
GX TYPE CENTRIFUGAL HIGH-EFFICIENT SPRAYING EQUIPMENT FOR COOLING TOWER EFFICIENCY ENHANCEMENT
ENERGY-SAVING RETROFIT OF NATURAL DRAFT COOLING TOWER
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
DESIGN AND ECONOMIC OPERATION OF DOUBLE-SPEED CIRCULATORY WATER PUMP FOR 135 MW INDIRECT AIR-COOLED UNIT
Related Author
ZHOU DaGuang'an Power Generation Co Ltd
PAN Rongquan
ZHU Litong
WEI Shirang Xi'an Thermal Power Research Institute Co.