您当前的位置:
首页 >
文章列表页 >
CAUSE AND ANALYSIS OF WATER-LEVEL FLUCTUATION IN IP DRUM WHEN THE GAS TURBINE RUNS IN OFF-DESIGN CONDITION
更新时间:2025-09-28
    • CAUSE AND ANALYSIS OF WATER-LEVEL FLUCTUATION IN IP DRUM WHEN THE GAS TURBINE RUNS IN OFF-DESIGN CONDITION

    • Thermal Power Generation   Issue 3, Pages: 63-66(2008)
    • DOI:10.19666/j.rlfd.2008.03.017    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • SUN Cheng-zhi, SUN Yu, LI Zi-chong Shenzhen City Guangqian Electric Power Co Ltd. CAUSE AND ANALYSIS OF WATER-LEVEL FLUCTUATION IN IP DRUM WHEN THE GAS TURBINE RUNS IN OFF-DESIGN CONDITION[J]. Thermal power generation, 2008, (3): 63-66. DOI: 10.19666/j.rlfd.2008.03.017.

  •  
  •  

0

Views

137

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Performance research of partially recuperative gas turbine combined cycle under off-design conditions
Feasibility of hot gas path components upgrading for a PG9351FA gas turbine
Thermal performance analysis of high-parameter gas turbine and supercritical carbon dioxide combined cycle system
STUDY ON VELOCITY UNIFORMITY IN INLET FLUE DUCT OF HEAT RECOVERY BOILER FOR LARGE-SCALE GAS TURBINE
CAUSE ANALYSIS OF REINFORCING WIRES FAILURE FOR INCOMING GAS SAFETY ISOLATING STRAINER OF THE GAS TURBINE

Related Author

LIU Taohong
LIU Hengping
SONG Xiaowei
YANG Yongping
LI Yunfeng
JIANG Hongwei
LU Xiaoyu
XIA Lin

Related Institution

College of Energy, Power and Mechanical Engineering, North China Electric Power University
China Power Investment Corporation Zhuhai Hengqin Thermal Power Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Shanghai Power Generation Equipment Complete Design and Research Institute Co., Ltd
Hangzhou Boiler Group Co., Ltd
0