您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF

    • Thermal Power Generation   Issue 3, Pages: 43-44(2008)
    • DOI:10.19666/j.rlfd.2008.03.011    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • ZHANG Lei1. CAUSE ANALYSIS OF REAR PLATEN SUPERHEATER LEAKAGE FOR BOILER OF ULTRA-SUPERCRITICAL UNIT AND REMEDIAL MEASURES THEREOF[J]. Thermal power generation, 2008, (3): 43-44. DOI: 10.19666/j.rlfd.2008.03.011.

  •  
  •  

0

Views

106

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Typical faults and countermeasures of flue gas cooler for coal-fired boilers
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN
CAUSE ANALYSIS OF LEAKAGE ACCIDENTS FOR “FOUR KINDS OF TUBES” AND COUNTERMEASURES THEREOF
CAUSE ANALYSIS OF SOMEWHAT LOW RATE FOR PUTTING HIGH-PRESSURE HEATER OF 200 MW UNITS INTO SERVICE AND RETROFITTING MEASURES THEREOF

Related Author

HU Fangfang
REN Jiyun
DENG Lei
WANG Yikun
CHE Defu
ZOU Ying
LUO Sheng
LI Yao-jun

Related Institution

School of Foreign Languages, Xi'an Jiaotong University
Huaneng Changjiang Environmental Protection Technology Co., Ltd
China Energy Engineering Group Shaanxi Electric Power Design Institute Co., Ltd
State Key Laboratory of Multiphase Flow for Power Engineering, Xi'an Jiaotong University
The Pearl River Power Plant Guangdong
0