SUI Zhi-gang1, WU Lü-bin1, CHEN Can2 1.Zhanjiang Electric Power Co Ltd. DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT[J]. Thermal power generation, 2008, (3): 39-42.
DOI:
SUI Zhi-gang1, WU Lü-bin1, CHEN Can2 1.Zhanjiang Electric Power Co Ltd. DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT[J]. Thermal power generation, 2008, (3): 39-42. DOI: 10.19666/j.rlfd.2008.03.010.
DESIGN FEATURES AND OPERATION PERFORMANCE OF THE FIRST ORIMULSION OIL BOILER FOR 600 MW UNIT