WANG Xiao-bin1, WANG Kai-zhu2, LIU Fu-jun31.Dalian Training Centre of Liaoning Electric Power Co Ltd. APPLICATION OF REMOTE COMMUNICATION IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2008, (2): 74-76.
DOI:
WANG Xiao-bin1, WANG Kai-zhu2, LIU Fu-jun31.Dalian Training Centre of Liaoning Electric Power Co Ltd. APPLICATION OF REMOTE COMMUNICATION IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2008, (2): 74-76. DOI: 10.19666/j.rlfd.2008.02.019.
APPLICATION OF REMOTE COMMUNICATION IN HUANENG QINBEI POWER PLANT
The situation of applying remote communication for 2×600 MW supercritical units in Huaneng Qinbei Power Plant
as well as the allocation patterns of the softwares and hardwares have been presented.and problems needing to pay attention in debugging being put forward.