您当前的位置:
首页 >
文章列表页 >
SEVERAL MAJOR DEFECTS IN MANUFACTURE AND INSTALLATION OF SUPERCRITICAL 650 MW UNIT
更新时间:2025-09-28
    • SEVERAL MAJOR DEFECTS IN MANUFACTURE AND INSTALLATION OF SUPERCRITICAL 650 MW UNIT

    • Thermal Power Generation   Issue 2, Pages: 62-63(2008)
    • DOI:10.19666/j.rlfd.2008.02.014    

      CLC: TM621.3
    • Published:2008

    移动端阅览

  • ZHU YuHuarei Electric Power Changshu Co Ltd. SEVERAL MAJOR DEFECTS IN MANUFACTURE AND INSTALLATION OF SUPERCRITICAL 650 MW UNIT[J]. Thermal power generation, 2008, (2): 62-63. DOI: 10.19666/j.rlfd.2008.02.014.

  •  
  •  

0

Views

35

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Techno-economic analysis and numerical simulation for four incorporate towers engineering in supercritical 2×350 MW units
Dynamic simulation for absorbed heat of super-heater in supercritical unit boilers
Coordinated control and optimization for unit equipped with single-line auxiliaries during low load operation
Fuzzy control system for intermediate point enthalpy based on feedforward of feed-water temperature

Related Author

ZHOU Jianghua
KUANG Min
ZHU Qunyi
LING Zhongqian
TI Shuguang
LI Zhengqi
ZHANG Jinliang
WANG Weishu

Related Institution

郑州轻工业学院建筑环境与能源应用工程系
中国计量大学计量测试与工程学院
哈尔滨工业大学能源科学与工程学院
宁波大学海运学院
Shenhua Shendong Fuping Thermal Power Generation Liability Co., Ltd.
0