UTILIZATION OF BY-PASS SYSTEM IN THE PROCESS OF COLD-STATE START-UP FOR 300 MW TURBO-GENERATOR SET
更新时间:2025-09-28
    • UTILIZATION OF BY-PASS SYSTEM IN THE PROCESS OF COLD-STATE START-UP FOR 300 MW TURBO-GENERATOR SET

    • Thermal Power Generation   Issue 2, Pages: 59-61(2008)
    • DOI:10.19666/j.rlfd.2008.02.013    

      CLC: TM311
    • Published:2008

    移动端阅览

  • MENG JieHuaneng Shang'an Power Plant. UTILIZATION OF BY-PASS SYSTEM IN THE PROCESS OF COLD-STATE START-UP FOR 300 MW TURBO-GENERATOR SET[J]. Thermal power generation, 2008, (2): 59-61. DOI: 10.19666/j.rlfd.2008.02.013.

  •  
  •  

0

Views

60

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ALLOCATION AND CAPACITY SELECTION OF BYPASS SYSTEM FOR LOCALIZED 600MW UNITS
TYPE AND CAPACITY SELECTION OF BYPASS SYSTEM FOR TURBINE UNITS
CONTROL OF BYPASS SYSTEM FOR STEAM TURBINE OF M701F GAS-STEAM COMBINED CYCLE UNIT UNDER SPECIAL OPERATING CONDITIONS
DESIGN AND APPLICATION OF A NEW BYPASS CONTROL STRATEGY FOR UNITS

Related Author

LI Xujun
KONG jian
FENG Xing-long
YAN JindongGuangdong Huizhou Natural Gas Power Generation Co Ltd
ZHU Jienan1
WU Yongcun1
JIN Qilin2
ZHANG Wei2

Related Institution

Guodian Thermal Power Research Institute
Huadian Zouxian Power Plant
Guangdong Huizhou Natural Gas Power Generation Co., Ltd
Guohua Zhejiang Energy Generation Co., Ltd
0