您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS AND ELIMINATION OF ABNORMAL SHUT-OFF FOR MAIN STEAM VALVE OF SUBCRITICAL 600 MW STEAM TURBINE
更新时间:2025-09-28
    • CAUSE ANALYSIS AND ELIMINATION OF ABNORMAL SHUT-OFF FOR MAIN STEAM VALVE OF SUBCRITICAL 600 MW STEAM TURBINE

    • Thermal Power Generation   Issue 2, Pages: 43-47(2008)
    • DOI:10.19666/j.rlfd.2008.02.009    

      CLC: TK267
    • Published:2008

    移动端阅览

  • ZHANG Jun-jie1, SHI Chao-xi2, YUAN Jun1, et al. CAUSE ANALYSIS AND ELIMINATION OF ABNORMAL SHUT-OFF FOR MAIN STEAM VALVE OF SUBCRITICAL 600 MW STEAM TURBINE[J]. Thermal power generation, 2008, (2): 43-47. DOI: 10.19666/j.rlfd.2008.02.009.

  •  
  •  

0

Views

134

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
Optimization calculation for sliding pressure of steam turbine with extraction for heating
LVDT faults auto-monitoring technology for turbine governing valve based on video processing
Economy analysis for an ultra supercritical 1 000 MW unit with EC-BEST thermal dynamic system

Related Author

GAN Chaoqi
LI Chunguang
WANG Yonggang
WEN Le
YANG Xinmin
WANG Weifeng
XUE Zhiheng
ZHANG Jiangfeng

Related Institution

Shenhua Guangdong Guohua Yuedian Taishan Power Generation Co., Ltd
Xi’an Thermal Power Research Institute Co., Ltd.
State Gird Zhejiang Electric Power Research Institute
State Gird Zhejiang Electric Power Corporation
西安热工研究院有限公司
0