您当前的位置:
首页 >
文章列表页 >
LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS
更新时间:2025-09-28
    • LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS

    • Thermal Power Generation   Issue 1, Pages: 95-96(2008)
    • DOI:10.19666/j.rlfd.2008.01.025    

      CLC: TM621.3
    • Published:2008

    移动端阅览

  • XUN Wei North-West China Power Construction & Debugging Research Institute. LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS[J]. Thermal power generation, 2008, (1): 95-96. DOI: 10.19666/j.rlfd.2008.01.025.

  •  
  •  

0

Views

89

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
ENERGY-SAVING RETROFIT OF INDUCED DRAFT FANS IN GUODIAN SHIZUISHAN POWER-GENERATION CO LTD, NING XIA HUI AUTONOMOUS REGION
ANALYSIS OF AN ACCIDENT CONCERNING SERIOUS EMULSIFICATION OF THE TURBINE OIL
CAUSE ANALYSIS AND CONTROL MEASURES OF UNSTABLE VIBRATION IN SHAFTING SYSTEM OF 300 MW TURBO-GENERATOR
CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF

Related Author

HE Tong-xiang
ZHANG Hua-lei
LI Ya-jun
WANG Zhi-cheng
ZHANG Xin-pin
DONG Kang-tian
WU Ping
WU Sanmao

Related Institution

Huadian Xinjiang Branch
North China Electric Power University
Xi'an Thermal Power Research Institute Co., Ltd
Guodian Shizuishan Power Generation Co., Ltd
0