XUN Wei North-West China Power Construction & Debugging Research Institute. LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS[J]. Thermal power generation, 2008, (1): 95-96.
DOI:
XUN Wei North-West China Power Construction & Debugging Research Institute. LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS[J]. Thermal power generation, 2008, (1): 95-96. DOI: 10.19666/j.rlfd.2008.01.025.
LOAD-REJECTION TEST OF 300 MW UNIT WITHOUT BY-PASS
In the process of load-rejection test of a 300 MW unit
several problems
such as the oscilation of turbine speed governing system
the unit can't maintain no-load operation in a short time
and the temperature of exhaust steam from high-pressure cylinder is more rapidly increasing etc.are often appeared.The load-rejection test of 300 MW unit manufactured by shanghai Steam Turbine Works has been presented