您当前的位置:
首页 >
文章列表页 >
ON-LINE OPTIMIZED OPERATION OF THE CIRCULATING WATER PUMP FOR 300 MW UNIT
更新时间:2025-09-28
    • ON-LINE OPTIMIZED OPERATION OF THE CIRCULATING WATER PUMP FOR 300 MW UNIT

    • Thermal Power Generation   Issue 1, Pages: 83-84(2008)
    • DOI:10.19666/j.rlfd.2008.01.021    

      CLC: TM621.2
    • Published:2008

    移动端阅览

  • TIAN Xiao-dong, LIU Fu-jun Tangshan Thermal Power Co Ltd. ON-LINE OPTIMIZED OPERATION OF THE CIRCULATING WATER PUMP FOR 300 MW UNIT[J]. Thermal power generation, 2008, (1): 83-84. DOI: 10.19666/j.rlfd.2008.01.021.

  •  
  •  

0

Views

135

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ELIMINATION OF LEAKAGE IN VACUUM SYSTEM OF UNIT NO.4 IN ZHANGZE POWER PLANT
THREE METHODS FOR DETERMINING OPTIMAL COMBINATION MODE OF CIRCULATING WATER PUMPS
ANALYSIS OF ABNORMALITIES OCCURRED IN THE VACUUM SYSTEM OF 350 MW UNIT MANUFACTURED BY MITSUBISHI CORPORATION
CAUSE ANALYSIS OF VIBRATION ON BEARING No.4 FOR STEAM TURBINE OF 300 MW UNIT
STUDY ON MEASURING METHOD FOR FLOW RATE OF AIR LEAKING INTO CONDENSER AND VACUUM SYSTEM

Related Author

WANG Chen-yu
YANG Qin1
DONG Jian-qiang2
ZHOU Xue-yuan11.Changxing Power Generation Co Ltd
XU Xian-long
ZHANG Jin-bao(Sanhe Power Generation Co Ltd
ZHANG Shan-peng1
XING Xiu-ping2 1.Shandong Electric Power Research Institute

Related Institution

Zhangze Power Plant
Changxing Power Generation Co., Ltd
Huzhou Electric Power Bureau
Sanhe Power Generation Co., Ltd
Shandong Electric Power Research Institute
0