您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF OPTIMIZED OPERATION POTENTIAL FOR THERMAL POWER UNITS
更新时间:2025-09-28
    • ANALYSIS OF OPTIMIZED OPERATION POTENTIAL FOR THERMAL POWER UNITS

    • Thermal Power Generation   Issue 12, Pages: 86-87(2007)
    • DOI:10.19666/j.rlfd.2007.12.024    

      CLC: TM621
    • Published:2007

    移动端阅览

  • WANG Bao-zhongGoadian Electric Power Development Co Ltd. ANALYSIS OF OPTIMIZED OPERATION POTENTIAL FOR THERMAL POWER UNITS[J]. Thermal power generation, 2007, (12): 86-87. DOI: 10.19666/j.rlfd.2007.12.024.

  •  
  •  

0

Views

165

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

CAUSE ANALYSIS OF QUALITY DETERIORATION FOR FIRE RESISTANT OIL USED IN YIMIN POWER PLANT AND COUNTERMEASURES THEREOF
DEVELOPMENT OF SPARE SPACE FOR DISTRIBUTED CONTROL SYSTEM AND ITS APPLICATION IN ENGINEERING
SIMULATION OF UNIT COORDINATED CONTROL SYSTEM(UCCS) BASED ON SOFTWARE BLINK
APPLICATION OF NUMERICAL SIMULATION IN OPTIMIZED DESIGN OF DEMISTOR FOR WET DESULFURATION
STUDY ON MULTI-OBJECTIVE OPTIMIZATION FOR CONTROL SYSTEM OF THE THERMAL PROCESS AND ITS APPLICATION IN BOILER-TURBINE COORDINATED CONTROL

Related Author

BI Fa sen
YANG Hua
HU Baiyong
CHEN Hengzhong
JIANG Ai-qin
ZHANG Xue-jun
WANG Qi(Taiyuan Electric Power High Professional College
LI Wen-yan

Related Institution

Yimin Power Plant Hulunbuir
Jiaxing Power Generation Co., Ltd
Jiaxing Power Generation Co., Ltd.
Taiyuan Electric Power College
0