您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF BEARING OVERTEMPERATURE FOR 100 MW TURBOGENERATOR SET
更新时间:2025-09-28
    • CAUSE ANALYSIS OF BEARING OVERTEMPERATURE FOR 100 MW TURBOGENERATOR SET

    • Thermal Power Generation   Issue 11, Pages: 92-93(2007)
    • DOI:10.19666/j.rlfd.2007.11.027    

      CLC: TM621.3
    • Published:2007

    移动端阅览

  • LIU Shun-qiShenhua Self-owned Thermal Power Plant for Preparing Oil From Coal. CAUSE ANALYSIS OF BEARING OVERTEMPERATURE FOR 100 MW TURBOGENERATOR SET[J]. Thermal power generation, 2007, (11): 92-93. DOI: 10.19666/j.rlfd.2007.11.027.

  •  
  •  

0

Views

47

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

NEN REPAIR METHOD OF BEARING PAD DAMAGE FOR A BALL TUBE MILL
CAUSE ANALYSIS OF OVER-TEMPERATURE OCCURRED ON STEAM TURBINE'S BEARING SHOE AND IT'S TREATMENT
FAILURE ANALYSIS OF STEAM TURBINE'S BEARING PAD DAMAGE
THE INFLUENCE OF ADJUSTING UNDERLAY IRON FOR STEAM TURBINE'S BEARING UPON CENTERING OF THE ROTOR
REPAIR OF ROTOR SHAFT NECK AFTER BURN-OUT OF BEARING SHOE ON TURBO-GENERATOR SET DUE TO OIL CUT-OFF

Related Author

LI Suan
李守伦
张清宇
GUAN Fu-an(65)
WANG Fu tan
XU Xue feng
QIAN Yu1
ZHENG Huili2 1.North China Electric Power University

Related Institution

Guangzhou Power Plant Guangdong Guangzhou
Jiaozuo Power Plant
Jiaozuo Power Plant Henan Jiaozuo
Jiaozuo Chemical Plant, Jiaozuo City
0