ZHENG Jian-tao1, CHEN Wen-yan2, LU Zhi-qing21.Xi’an Thermal Power Reseach Institute Co Ltd. EMULATION MODELLING OF GAS TURBINE SYSTEM[J]. Thermal power generation, 2007, (11): 56-59.
DOI:
ZHENG Jian-tao1, CHEN Wen-yan2, LU Zhi-qing21.Xi’an Thermal Power Reseach Institute Co Ltd. EMULATION MODELLING OF GAS TURBINE SYSTEM[J]. Thermal power generation, 2007, (11): 56-59. DOI: 10.19666/j.rlfd.2007.11.015.
EMULATION MODELLING OF GAS TURBINE SYSTEM
摘要
随着燃气-蒸汽联合循环发电机组在我国的不断发展
利用仿真培训系统提高运行人员操作水平具有极好的效果。对此
介绍了采用美国GSE公司的仿真建模平台
以典型燃气轮机系统为对象
对其设备和相关系统进行的仿真建模研究。
Abstract
Along with continuous development of the power-generating units with gas and steam combined cycle in our country
utilization of emulation training system to enhance the operating-skill of operators has extremely good effectiveness. For this
a study on emulation modelling for equipment and related systems has been carried out by using emulation modelling platform manufactured by GSE Company in USA
and taking typical gas turbine system as the object.