您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF PROLONGED IDLING TIME FOR UNIT NO.2 IN GUOHUA TAISHAN POWER PLANT AND DISPOSAL THEREOF
更新时间:2025-09-28
    • CAUSE ANALYSIS OF PROLONGED IDLING TIME FOR UNIT NO.2 IN GUOHUA TAISHAN POWER PLANT AND DISPOSAL THEREOF

    • Thermal Power Generation   Issue 10, Pages: 41-43(2007)
    • DOI:10.19666/j.rlfd.2007.10.012    

      CLC: TK267
    • Published:2007

    移动端阅览

  • LU Lian-xiangGuohua Taishan Power Plant. CAUSE ANALYSIS OF PROLONGED IDLING TIME FOR UNIT NO.2 IN GUOHUA TAISHAN POWER PLANT AND DISPOSAL THEREOF[J]. Thermal power generation, 2007, (10): 41-43. DOI: 10.19666/j.rlfd.2007.10.012.

  •  
  •  

0

Views

102

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STUDY ON USING HOT AIR FOR HEATING CLEANED FLUE GAS IN GUOHUA TAISHAN POWER PLANT
ANALYSIS OF HIGH-PRESSURE GOVERNOR VALVE'S FLUTTER IN DEN CONTROL SYSTEM OF A 600MW UNIT AND TREATMENT THEREOF
ANALYSIS OF SOOTBLOWING OPTIMIZATION FOR BOILER FOR 600MW UNIT
DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT
OPERATIONAL PERFORMANCE OF THE FLUE GAS DESULFURATION SYSTEM WITH SPRAY BUBBLING TOWER ON 600 MW UNIT

Related Author

LI Zhan-yuan
SUN Yue
YANG Jian-xing
GAO Peng
ZHUANG Wen-jun Guohua Taishan Power Plant
Li Jin
杨卫娟
周俊虎

Related Institution

Guohua Taishan Power Generation Co., Ltd
Yangzhou Second Power Plant
Zhejiang University
Xi'an Thermal Power Research Institute Co., Ltd
0