REMEDY OF TUBE-BURST IN SUSPENDED PIPING SYSTEM OF FRONT EMBRACING WALL IN THE REAR VERTICAL SHAFT OF 670 t/h BOILER
更新时间:2025-09-28
    • REMEDY OF TUBE-BURST IN SUSPENDED PIPING SYSTEM OF FRONT EMBRACING WALL IN THE REAR VERTICAL SHAFT OF 670 t/h BOILER

    • Thermal Power Generation   Issue 7, Pages: 85-88(2007)
    • DOI:10.19666/j.rlfd.2007.07.025    

      CLC: TK223
    • Published:2007

    移动端阅览

  • LI Hong-boXinjiang Huadian Hongyanchi Power Generation Co Ltd, Wulumqi 830047, Xinjiang Region. REMEDY OF TUBE-BURST IN SUSPENDED PIPING SYSTEM OF FRONT EMBRACING WALL IN THE REAR VERTICAL SHAFT OF 670 t/h BOILER[J]. Thermal power generation, 2007, (7): 85-88. DOI: 10.19666/j.rlfd.2007.07.025.

  •  
  •  

0

Views

56

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

STUDY ON TUBE-WALL TEMPERATURE BEHAVIOR OF SUPERHEATER FOR BOILERS
Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit
Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
Application of treatment technology for oxide scale on superheaters
TESTING STUDY AND COMPREHESIVE WAY TO CONTROL SLAGGING IN THE FURNACE AND OVERTEMPERATURE OF THE SUPERHEATER FOR BOILER No.8 IN BAOTOU THERMAL POWER PLANT No.1

Related Author

Li Jian-long
ZENG Han-cai
GAO Jinghui
WANG Lin
YANG Bo
ZHANG Yafu
ZHAO Zhidan
WANG Hongyu

Related Institution

Huazhong University of Science and Technology, Huazhong University of Science and Technology, Wuhan 430071
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guohua Electric Power Research Institute Company Limitied
Hebei Guohua Dingzhou Power Generation Co.,Ltd.,Dingzhou
Inner Mongolia Electric Power Research Institute
0