    • TEST OF RUN-BACK FUNCTION FOR 600MW UNIT AND ANALYSIS THEREOF

    • Thermal Power Generation   Issue 7, Pages: 62-65(2007)
    • DOI:10.19666/j.rlfd.2007.07.017    

      CLC: TK323
    • Published:2007

    移动端阅览

  • LUO Zhi-hao, WANG Da-feng, YAO Wen-weiZhejiang Provincial Electric Power Test & Research Institute. TEST OF RUN-BACK FUNCTION FOR 600MW UNIT AND ANALYSIS THEREOF[J]. Thermal power generation, 2007, (7): 62-65. DOI: 10.19666/j.rlfd.2007.07.017.

  •  
  •  

0

Views

151

下载量

16

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

ANALYSIS OF “UNSYMMETRIC BURNING” PROBLEM IN A W-SHAPED FLAME BOILER OF 600 MW UNIT
CAUSE ANALYSIS OF PRIMARY FAN VIBRATION FOR A 130 t/h CFB BOILER
CONTROL STRATEGY OF SUPERCRITICAL ONCE-THROUGH BOILER FOR 600 MW UNITS
CAUSE ANALYSIS OF JAMMING AND AIR LEAKAGE OF THE HOT-AIR DAMPER AND RETROFIT THEREOF
ANALYSIS OF COORDINATED CONTROL SYSTEM FOR 600 MW UNITS

Related Author

MIAO Changxin
WANG Jianwei
ZHAO Hongyan
YOU Wenjie
YAN Zhaoping
HUANG Hongyan
CHEN Huadong
AN Xue-zhong

Related Institution

Shandong Electric Power Research Institute
Liaocheng Power Plant
Shenma Nylon Chemical Co., Ltd
Shenma Engineering Plastics Co., Ltd.
0