YU Peng, GAO Xiao-chun, HE De-ming, et al. ECONOMIC OPERATION OF THE LIME-STONE/GYPSUM WET DESULFURATION SYSTEM[J]. Thermal power generation, 2007, (7): 34-36.
DOI:
YU Peng, GAO Xiao-chun, HE De-ming, et al. ECONOMIC OPERATION OF THE LIME-STONE/GYPSUM WET DESULFURATION SYSTEM[J]. Thermal power generation, 2007, (7): 34-36. DOI: 10.19666/j.rlfd.2007.07.009.
ECONOMIC OPERATION OF THE LIME-STONE/GYPSUM WET DESULFURATION SYSTEM
摘要
介绍台山电厂2×600 MW机组石灰石-石膏湿法烟气脱硫系统实现经济运行的经验
给出了降低电耗、水耗、石灰石耗量的具体措施。两年多的运行实践表明
机组在额定工况下
在保证脱硫效率达95%的前提下
台山电厂脱硫系统多项运行指标均优于设计值。
Abstract
The experiences of economic operation realized in lime-stone/gypsum wet FGD system for two 600 MW units of Taishan Power Plant have been presented
and concrete measures for decreasing consumption of electricity
water
and lime-stone being given.The operation practice of more than two years shows that the operation indices of the desulfuration system in Taishan Power Plant are better than the designed values in the event of units being under nominal operating condition
and under prerequisite of ensuring the desulfuration efficiency to be up to 95%.