您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF AND MEASURES TAKEN FOR SOMEWHAT LOWER REHEATED STEAM TEMPERATURE APPEARED ON BOILER NO.2 IN ONE POWER PLANT
更新时间:2025-09-28
    • CAUSE ANALYSIS OF AND MEASURES TAKEN FOR SOMEWHAT LOWER REHEATED STEAM TEMPERATURE APPEARED ON BOILER NO.2 IN ONE POWER PLANT

    • Thermal Power Generation   Issue 6, Pages: 125-126(2007)
    • DOI:10.19666/j.rlfd.2007.06.035    

      CLC: TK227
    • Published:2007

    移动端阅览

  • LIU Qi1, WANG Xin-yuan2, LI Jian-he3, et al. CAUSE ANALYSIS OF AND MEASURES TAKEN FOR SOMEWHAT LOWER REHEATED STEAM TEMPERATURE APPEARED ON BOILER NO.2 IN ONE POWER PLANT[J]. Thermal power generation, 2007, (6): 125-126. DOI: 10.19666/j.rlfd.2007.06.035.

  •  
  •  

0

Views

98

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

TEST AND THERMAL PERFORMANCE ANALYSIS OF SUPERHEATER AND REHEATER FOR UTILITY BOILERS
CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
DIAGNOSIS AND ELIMINATION OF VIBRATION TROUBLES OCCURRED ON UNIT No. 1 IN ONE POWER PLANT
ESTABLISHMENT OF SERVICE LIFE MANAGEMENT SYSTEM FOR HIGH-TEMPERATURE BOILER TUBES IN THERMAL POWER PLANT BASED ON B/S STRUCTURE
ANALYSIS AND REMEDY OF CONDENSATE-BOOSTING PUMP VIBRATION FOR UNIT NO.8 IN HUANGTAI POWER PLANT

Related Author

YANG Tao
WANG Zhen-wen
LIU Qi
LIU Tong
XU Gang
LIU Xi-qiu
DU Bao-hua
LI Yao-jun

Related Institution

Guodian Thermal Power Research Institute
North China Electric Power University Beijing
North China Electric Power University
Guodian Quanzhou Power Generation Co., Ltd
0