LI Yi-jieHuaneng Guangdong Branch Company. AN APPROACH TO THE WHOLE PLANT AUTOMATION DESIGN SCHEME FOR 1 000 MW UNITS[J]. Thermal power generation, 2007, (6): 9-12.
DOI:
LI Yi-jieHuaneng Guangdong Branch Company. AN APPROACH TO THE WHOLE PLANT AUTOMATION DESIGN SCHEME FOR 1 000 MW UNITS[J]. Thermal power generation, 2007, (6): 9-12. DOI: 10.19666/j.rlfd.2007.06.003.
AN APPROACH TO THE WHOLE PLANT AUTOMATION DESIGN SCHEME FOR 1 000 MW UNITS
摘要
针对1000 MW机组在自动化设计方面面临的新问题
以典型的1000 MW机组自动化规划为例
提出了1000 MW机组自动化控制设计方案。
Abstract
Directing against new problems being faced in aspect of automation design for 1 000 MW units
and taking typical 1 000 MW units’ automation planning as a case study
an automatic control design scheme has been put forward.