QIN Guang-ming(Shaoguan Power Plant. TEST OF 200 MW UNIT RB[J]. Thermal power generation, 2007, (5): 68-69.
DOI:
QIN Guang-ming(Shaoguan Power Plant. TEST OF 200 MW UNIT RB[J]. Thermal power generation, 2007, (5): 68-69. DOI: 10.19666/j.rlfd.2007.05.020.
通过对某火电厂200 MW机组辅机故障减负荷(RB)功能的模拟和实际试验
验证了其控制方案的合理性
试验可为在同类型的机组上应用RB功能提供参考。
Through simulation and practical test of Run Back(RB) function concerning 200 MW unit in one power plant
the reasonality of the control system has been veritified
providing with reference for adopting RB function onto similar type units.